The integrated ceiling not only has various functions such as heating and ventilation, but also changes the monotonous color of the ceiling. In the kitchen and bathroom, we often install integrated suspended ceilings. With the continuous development and expansion of the industry, we have developed customized ceilings for the whole house at this stage. The following Xiao Bian will introduce you to the installation methods and techniques of AIA Integrated Ceiling .
Pre-installation precautions:
Before installing the ceiling, make sure there is no water leakage in the place where it needs to be installed to ensure the smoothness of the infrastructure such as the circuit; predict the height of the room after installation is convenient for the installation of the corner line; check the strength of the place to be installed, if the strength If you do not meet the requirements, you need to take reinforcement measures.
Install the necessary tools:
Tape measure, ink fountain, equal-angle square ruler, scissors, cutting machine, polishing machine, electric hammer, pistol drill, steel ball, wooden hammer, hammer, 8 inch wrench, impact drill, word/Phillips screwdriver, terminal board, Test pencils, saws, saw blades, etc.
Installation Step 1: Install Six Screws
1, according to a good size, in the ceiling brick screwed into the expansion tube screw, pay attention to the height between the ceiling and the roof is not less than 25cm rod must be perpendicular to the ceiling, and fixed securely, six screws kept parallel.
2. Take an average of six points on the ceiling and use electric hammer to drill holes (do not affect the installation of electrical appliances). Measure the distance from the top to the corner line, cut the screw with a short distance of 8-10cm from the actual distance, screw one nut on one side and screw in the expansion screw (the screw exposes about 3mm), and screw the nut on the other side. The main keel is suspended and screwed into a nut.
3ã€Put the expansion screw and screw connection into the hole, connect the big ceiling with the screw with 6mm diameter, screw the nut into the screw, then insert the big hanging piece, then screw in the nut, and so on. .
Installation Step 2: Install the keel
The installation of the keel is very important, and the installation of the keel and electrical installation of the keel will also be a lot smoother.
1. Comparing the size of the large hanging pieces, clamp the main keel on the hanging pieces, cut the required size, and pay attention to keep the main keel parallel.
2. Put the triangle hanging piece into the triangular keel, and then fix it on the main keel. Before fixing the triangular keel, adjust the distance between each keel to 300mm. The outlet ducts of the range hoods are arranged in front of the gussets and are not required if no range hoods are installed.
3, the specific method is: subtract 5mm in the installation length and then cut the required triangular keel. After the triangle hanging piece is put into the triangular keel, the triangular hanging piece is stuck on the main keel. Pay attention to the opposite of the same triangle card keel hanging on the main keel, so that it will not swing when the installation continues.
Installation step three: install the board
1. First, insert the connector into the fixed triangular keel, cut the other end of the required length of the connector, and insert the connector.
2, install the buckle board. First lift the film on the four sides of the gusset and install it in the same direction as the arrow on the film. The first row of gussets is generally installed with a utility knife for cutting. Attention should be paid to appearance and symmetry, and the cutting edge should face the wall.
3, the cutting plate will be clipped in the triangular keel, the cut surface frame on the edge of the edge and pull out the edge of the card to the card buckle, as an example to install the first row of the buckle plate.
4. Control the gap between the first row of pinch plates so that the pinch plate spacing is 0, and the four corners are in a “10†shape and the pinch plate surface height must be the same. The installation quality of the first version of the gusset plate directly determines the installation quality of the rear gusset plate.
Installation Step 4: Install Electrical Appliances
1. Insert one side of the spring into the round hole on the mounting clip spring of the box, and insert the machine screw into the round hole on the electrical box and lock it. The box body with the snap spring installed is placed on the keel. The open slots of the four snap springs are pressed in turn against the triangular keel, and the electrical box body is firmly locked on the triangular keel.
2. Next, open the terminal box and connect it according to the corresponding function according to the wiring label, and then install the switch to test whether it is energized or not. After the power is turned on, close the terminal box.
3, the final check of the overall board is flat, electrical appliances can be used normally and so on, where the installation of integrated ceiling is basically completed.
The relevant information about the installation of AIA Ceiling was introduced here for everyone. I hope this article will help you. If you still have something that you don't understand, you can leave a message for Xiaobian at the bottom. We will answer you as soon as possible.
Integrated ceiling Bluemite integrated ceiling how
Integrated ceiling 2014 living room ceiling decoration prices
Why should Bonbon ceilings be suspended?
Integrated ceiling selection Rongsheng integrated ceiling price
Ceiling Mounting Ceiling Design AIA Integrated Ceiling AIA Integrated Ceiling Price Living Room Wall Color Ceiling Price Decoration Living Room Kitchen Integrated Ceiling Bathroom Ceiling Overall Bathroom Bathroom Size Bathroom Leakage
Remote Control Gas Valve,Gas Remote Control Valve,Smart Valve Remotely Control,Remote Control Gas Valve Hose
NARWILL IMPORT&EXPORT CO.LTD , https://www.narwill.com