Painting equipment accumulation chain maintenance instructions


Painting equipment accumulation chain maintenance instructions:

1 Accumulate chain guide roller and grease lubrication once every six months (can be carried out in batches).
2 accumulation chain car duck head and butter lubrication once every six months.

3 accumulation chain chain spray lubrication once a week spray lubrication, the time must not be less than four hours. (The oil tank needs to be replenished in time)

4 Each time the fixing bolts on the chain tensioning drive are inspected once a month.

5 The sprocket connection fixing bolts of the accumulation chain should observe the running condition every day.
Http://

Garden Crane Lights

Outdoor Red-crowned Crane Landscape Lights,Outdoor Red-crowned Crane Lawn Lights,Red-crowned Crane Landscape Lights,Simulation Red-crowned Crane Lights

Sichuan Kangruntengpu Photoelectric Technology Co., Ltd. , https://www.tengpulighting.com