Geothermal installation costs to pay attention to the use of geothermal installation

The installation of geothermal power is now a common practice for every family, because geothermal heat brings us a comfortable and healthy living environment. Since geothermal heat has not been developed in China for long, many people have been exposed to geothermal systems for the first time. . The installation and use of floor heating is not particularly experienced. As a user who is exposed to floor heating for the first time, we shall specifically understand the related issues concerning the installation cost of geothermal heating and what should be paid attention to in geothermal installation.

About geothermal installation costs

1, geothermal installation location is in the ground in our room, and then from the ground up to heat to make the interior temperature becomes warm, while the ground heat is based on the entire ground as a radiator, through the heat radiation medium in the floor radiation layer, Evenly heat the entire floor. Beijing Manjiang Red Land uses the ground's own heat storage, and the law of upward radiation of heat is conducted from the bottom up to achieve the purpose of heating. It is divided into two types: dry water and electric ground heating. There are dry and wet installations.

2, in general, many people do not know much about the installation costs of geothermal, then next to find out about about 80 square meters of housing, the installation of geothermal costs about between 15,000 yuan to 3 million. If it is electric geothermal, the cost may be even higher. The thermal energy converted by 1 kWh is 3,600 kilojoules, and the thermal efficiency of electricity is 98%. The power consumption of 80 square meters for a month is 2351 degrees. In accordance with the peak hour electricity price of 0.6 yuan / degree, 16 hours a day to run, when the valley electricity price of 0.3 yuan / degree, 8 hours a day to calculate, 1 month's electricity is 1176 yuan .

Geothermal installation should pay attention to what

1. For those geothermal households that use central heating sources, the heating companies will heat the pipes in the winter, and then begin to run for several days. The main valve should be closed as far as possible so that the heating companies can avoid the foreign matter of the pipeline. Into the local warm system. In order to protect the floor, it is necessary to pay attention to the initial use of the floor heating system. Start by not opening the system's circuits and increase the temperature as slowly as possible. After the concrete layer of the low-temperature hot-water floor radiant heating system is finished, the doors and windows should be closed and sprinkled regularly every day for a week.

2, geothermal heating system, the water temperature is generally best is below 60 °C, and its heating system working pressure can not exceed 0.8Mpa. The floor heating system should clean the filter once a year before use. First close the inlet and outlet valves of the connecting conduit, then open the filter, remove the filter and clean it. Check whether the filter is damaged or blocked. If it is damaged, it should be replaced with the filter of the same specification, and it can be installed as it is. You should pay attention to the process of disassembling the filter, and do not let the impurities enter the tube.

3. The water flow of each branch of the geothermal system can be adjusted through the ball valve on each branch, and it can be used to control the temperature of each part, but the adjustment should be done carefully so as not to affect other branches. In the floor heating system, air may accumulate in the pipeline during the start of water supply or use, which may affect the heating effect. At this time, the air bleed valve of the water separator can be opened and the gas can be discharged. The method is the same as the traditional heating.

The above information on geothermal installation costs and what to pay attention to for geothermal installation is introduced here. I hope this helps everyone. If you still don't understand where you can pay attention to more news, if you want to learn more about this news, please continue to pay attention to our website.

Steel Grating

For products reference
No. Item Description
1 Bearing Bar Size 25x3, 25x4, 25x4.5, 25x5, 30x3, 30x4, 30x4.5, 30x5, 32x5, 40x5, 50x5, 65x5, 75x6, 75x10---100x10mm etc.
I bar: 25x5x3, 30x5x3, 32x5x3, 40x5x3 etcUS standard: 1''x3/16'', 1 1/4''x3/16'', 1 1/2''x3/16'', 1''x1/4'', 1 1/4''x1/4'', 1 1/2''x1/4'', 1''x1/8'', 1 1/4''x1/8'', 1 1/2''x1/8'' etc.
2 Bearing Bar Pitch 12.5, 15, 20, 23.85, 25, 30, 30.16, 31, 32.5, 34.3, 35, 38.1, 40, 41.25, 60, 80mm etc.
US standard: 19-w-4, 15-w-4, 11-w-4, 19-w-2, 15-w-2 etc.
3 Cross Bar Size and Pitch Twisted bars 5x5, 6x6, 8x8mm; Round bars Dia.6, 7, 8, 9, 10, 12mm and so on.
38.1, 40, 50, 60, 76, 80, 100, 101.6, 120, 135mm, 2'' & 4'' etc.
4 Material Grade ASTM A36, A1011, A569, Q235, S275JR, SS400, Mild steel & Low carbon steel, etc.
Stainless steel SS304, SS316.s335jr
5 Surface Treatment Black, self colour, hot dip galvanized, painted, powder coating, electrolytic polishing.
6 Grating Style Plain / Smooth, Serrated /teeth, I bar, serrated I bar.
7 Standard China: YB/T 4001.1-2007, USA: ANSI/NAAMM(MBG531-88),UK: BS4592-1987, Australia: AS1657-1985,Germany: DIN24537-1-2006, Japan: JIS.
8 Panel Size: 3x20ft,3x24ft,3x30ft,5800x1000, 6000x1000, 6096x1000,6400x1000, as request
9 Application: oil refinery,petroleum and chemical Industry, Seaport and airport, power plant, transportation, papermaking, medicine, steel and iron, food, municipality, real estate, manufacturing,metallurgy,railway,boiler,etc

Steel Grating,Steel Bar Grating,Galvanized Steel Bar Grating,Steel Bar Grating For Bridge

HEBEI KAYI BUILDING MATERIAL TECHNOLOGY CO.,LTD , https://www.kayigrating.com